Microsoft-Nebius New Jersey
Microsoft-Nebius New Jersey is an operational AI data center operated by Nebius in New Jersey, United States. Its power is about 70 MW. Epoch AI estimates about 57,000 H100-equivalent AI chips (B300).
Key facts
| Status | Operational |
|---|---|
| Operator | Nebius |
| Users | Microsoft (likely) |
| Facility power | 70 MW Reported (Epoch AI or owner data) |
| IT power | 50 MW |
| AI compute | 57,000 H100-equivalents |
| AI chips | B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 28,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 1.9 billion Epoch AI estimate, 2025 USD. |
| Also known as | DataOne Vineland |
| Address | 3963 S Lincoln Ave, Vineland, New Jersey |
| Coordinates | 39.42820, -75.01841 |
Power and grid
| Utility | City Of Vineland (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 39.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 630 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.06 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-05-31 | 0 | 0 | Land clearing begins for northern two buildings (Building 1-2). |
| 2025-12-15 | 0 | 0 | By mid-December 2025 the building was still not complete. A satellite analysis by SemiAnalysis found that the air-cooled chillers serving the second half of the first 50 MW phase were not yet installed, so the phase was not yet operational. SemiAnalysis estimated the full 50 MW would be reached around January to February 2026. |
| 2026-04-15 | 70 MW | 57,000 | High-resolution satellite imagery shows the air-cooled chiller array has grown to roughly 30 units, enough to support the first phase. We estimate Building 1 became operational around early 2026 with about 50 MW of IT capacity (70 MW total facility power at a 1.4 PUE), based on DataOne's disclosure of a first 50 MW phase. SemiAnalysis estimated the full 50 MW was reached around January to February 2026 ([SemiAnalysis](https://newsletter.semianalysis.com/p/stop-saying-half-of-2026-us-datacenter)); this April image is our first high-resolution confirmation that the cooling is in place. |
| 2026-07-12 | 70 MW | 57,000 | Compared with the April 2026 image, the building shell is closer to completion, and several additional air-cooled chillers have appeared on the ground, though they do not yet appear to be connected or operating. We therefore keep IT capacity at 50 MW. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-04-15 | B300 | 22,500 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft-Nebius New Jersey use?
Public data puts the facility power at about 70 MW. Reported (Epoch AI or owner data).
What chips does Microsoft-Nebius New Jersey use?
Reported chips: B300.
How clean is the power for Microsoft-Nebius New Jersey?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates Microsoft-Nebius New Jersey?
Nebius. Reported users: Microsoft.
Data centers near New Jersey
- Data center in Woodbury 47.3 km · 8.2 MW
- TierPoint Philadelphia 53.1 km
- IPR Wilmington CCC 57.6 km
- 833 Chestnut Street 59.2 km
- Quonix Datacenter (2401 Locust St) 59.7 km
- Equinix PH1 - Philadelphia 60.3 km · 85 MW
- Crown Castle Philadelphia (1309 Noble) 60.4 km
- H5 Data Centers Philadelphia (PA01) 60.7 km
More Nebius data centers
- Nebius Mantsala Finland
Sources
- Epoch AI, Frontier Data Centers
- Nebius: up to 300 MW capacity at new New Jersey data center
- DataOne and Nebius partner for 300 MW AI data center (Data Centre Magazine)
- Microsoft secures 100,000 NVIDIA GB300 via Nebius deal (Tom's Hardware)
- DataOne CEO on first 50 MW delivery to Nebius (LinkedIn)
- Large data center nears completion in Vineland (Cape May County Herald)
- SemiAnalysis: Stop Saying Half of 2026 US Datacenter Capacity Is Canceled
- OpenStreetMap way 1553894888
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.