TierPoint Philadelphia
TierPoint Philadelphia is an operational data center operated by TierPoint in Philadelphia, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | TierPoint |
| Networks | 2 networks PeeringDB. |
| Address | 4775 League Island Blvd |
| Coordinates | 39.89247, -75.16548 |
| Website | tierpoint.com |
Power and grid
| Utility | Peco Energy Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 2.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 387 g CO₂ per kWh (Pennsylvania, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 58%, nuclear 30.3%, coal 7.1%, wind 1.4%, solar 1.4%. Clean power: 34.3% |
| Industrial power price | USD 0.105 per kWh (Pennsylvania, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.1 °C (2001 to 2025) |
| Cooling degree days | 605 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 5.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Pennsylvania) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for TierPoint Philadelphia?
The grid in Pennsylvania emits about 387 g CO₂ per kWh (2025). Largest sources: gas 58%, nuclear 30.3%, coal 7.1%.
Who operates TierPoint Philadelphia?
TierPoint.
Data centers near Philadelphia
- 833 Chestnut Street 6.4 km
- Quonix Datacenter (2401 Locust St) 6.6 km
- Data center in Woodbury 7.3 km · 8.2 MW
- Equinix PH1 - Philadelphia 7.5 km · 85 MW
- Crown Castle Philadelphia (1309 Noble) 7.6 km
- 365 Data Centers Philadelphia (PH2) 7.6 km
- H5 Data Centers Philadelphia (PA01) 7.8 km
- DāStor: 3400 Horizon Drive 26.3 km
More TierPoint data centers
- TierPoint St. Louis - Olive United States
- TierPoint Boston - Andover United States
- TierPoint Kansas City - Lenexa United States
- TierPoint Sioux Falls - West United States
- TIerPoint Little Rock United States
- TierPoint Baltimore United States
- TierPoint Nashville United States
- TierPoint Tulsa-Archer United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.