Data center in Woodbury
Data center in Woodbury is an operational data center in Woodbury, United States. Our footprint estimate of its power is about 8.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 8.2 MW (range 4.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,843 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 39.83093, -75.19532 |
Power and grid
| Nearest high-voltage substation | Thorofare Substation, 230 kV, 900 m away (Public Service Enterprise Group) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 100 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 11 GW in 101 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.1 °C (2001 to 2025) |
| Cooling degree days | 605 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 5.5 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Woodbury use?
We estimate the facility power at about 8.2 MW. Estimate from building footprint, low confidence.
How close is Data center in Woodbury to the power grid?
The nearest high-voltage substation in OpenStreetMap is Thorofare Substation (230 kV), about 900 m away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.
How clean is the power for Data center in Woodbury?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Data centers near Woodbury
- TierPoint Philadelphia 7.3 km
- Quonix Datacenter (2401 Locust St) 13.3 km
- 833 Chestnut Street 13.7 km
- 365 Data Centers Philadelphia (PH2) 14.0 km
- Equinix PH1 - Philadelphia 14.6 km · 85 MW
- Crown Castle Philadelphia (1309 Noble) 14.7 km
- H5 Data Centers Philadelphia (PA01) 14.9 km
- DāStor: 3400 Horizon Drive 31.1 km