Nextstream Data Center is an operational data center in Ñuñoa, Chile. Our footprint estimate of its power is about 2.7 MW.

Key facts

StatusOperational
Facility power2.7 MW (range 1.3 MW to 4.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,214 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressAvenida Apoquindo 7071
Coordinates-33.40809, -70.55713

Power and grid

Grid carbon intensity291 g CO₂ per kWh (Chile, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 25.1%, hydro 22.2%, coal 17.8%, gas 15.3%, wind 13.1%. Clean power: 66.4%

Climate and water

Average temperature15.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.9 °C (2001 to 2025)
Cooling degree days445 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.42 kWh per m² per day
Wind at 50 m3.2 m/s average
Water stress todayExtremely High (>80%) (Chile)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Nextstream Data Center use?

We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.

How clean is the power for Nextstream Data Center?

The grid in Chile emits about 291 g CO₂ per kWh (2025). Largest sources: solar 25.1%, hydro 22.2%, coal 17.8%.

Data centers near Ñuñoa

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.