TNS CHILE-TECHNETSECURITY
TNS CHILE-TECHNETSECURITY is an operational data center operated by TNS CHILE-TECHNETSECURITY in Santiago, Chile. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | TNS CHILE-TECHNETSECURITY |
| Address | Av. del Valle Norte 714, piso 4, Huechuraba |
| Coordinates | -33.39313, -70.61392 |
| Website | tnschile.com |
Power and grid
| Nearest high-voltage substation | Subestación Vitacura, 110 kV, 2.1 km away (Enel Distribución Chile) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestación El Salto, 220 kV, 4 km away |
| HV substations within 10 km | 17 |
| Power plants within 50 km | 1.2 GW in 80 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 291 g CO₂ per kWh (Chile, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 25.1%, hydro 22.2%, coal 17.8%, gas 15.3%, wind 13.1%. Clean power: 66.4% |
Climate and water
| Average temperature | 15.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 445 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.42 kWh per m² per day |
| Wind at 50 m | 3.2 m/s average |
| Water stress today | Extremely High (>80%) (Chile) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is TNS CHILE-TECHNETSECURITY to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación Vitacura (110 kV), about 2.1 km away.
How clean is the power for TNS CHILE-TECHNETSECURITY?
The grid in Chile emits about 291 g CO₂ per kWh (2025). Largest sources: solar 25.1%, hydro 22.2%, coal 17.8%.
Who operates TNS CHILE-TECHNETSECURITY?
TNS CHILE-TECHNETSECURITY.
Data centers near Santiago
- Netglobalis 696 m
- Amazon Web Services 2.7 km
- Bynarya 3.1 km
- Central de Transmisiones 3.9 km · 0.6 MW
- Intesis Chile 4.2 km
- DataCenter Siptelchile 4.4 km
- Internexa Santiago de Chile 4.5 km
- Nextstream Data Center 5.5 km · 2.7 MW