NorthC Münchenstein (Basel) 1
NorthC Münchenstein (Basel) 1 is an operational data center operated by NorthC Schweiz in Münchenstein, Switzerland. Our footprint estimate of its power is about 0.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NorthC Schweiz |
| Facility power | 0.7 MW (range 0.3 MW to 1.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,433 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 7 networks PeeringDB. |
| Also known as | NorthC data centers Basel |
| Address | Weidenstrasse 41 |
| Coordinates | 47.51250, 7.61544 |
| Website | northcdatacenters.com/ch-de |
Power and grid
| Grid carbon intensity | 39 g CO₂ per kWh (Switzerland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7% |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.3 °C (2001 to 2025) |
| Cooling degree days | 104 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.43 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Low (<10%) (Basel-Landschaft) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NorthC Münchenstein (Basel) 1 use?
We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.
How clean is the power for NorthC Münchenstein (Basel) 1?
The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.
Who operates NorthC Münchenstein (Basel) 1?
NorthC Schweiz.
Data centers near Münchenstein
- NorthC Münchenstein (Basel) 2 288 m
- Klixa Muttenz 3.5 km
- IWB Datacenter Basel 4.5 km
- Colobâle 4.6 km
- Microsoft 27.5 km
- data11 35.2 km
- Kom4Tel GmbH 43.0 km
- Green Datacenter ZRH1 (fka: Green Lupfig) 45.4 km · 7.8 MW
More NorthC Schweiz data centers
- NorthC Biel (Bern) Switzerland
- NorthC Münchenstein (Basel) 2 Switzerland
- NorthC Winterthur (Zürich) Switzerland
Sources
Correct this page or get the data