Novo Nordisk Gefion

Novo Nordisk Gefion is an operational AI data center operated by Novo Nordisk Foundation,Danish Centre for AI Innovation,Export and Investment Fund of Denmark in Odder, Denmark. Its power is about 2.9 MW. Epoch AI estimates about 3,032 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).

Key facts

StatusOperational
OperatorNovo Nordisk Foundation,Danish Centre for AI Innovation,Export and Investment Fund of Denmark
Facility power2.9 MW
Reported (Epoch AI or owner data)
AI compute3,032 H100-equivalents
AI chipsNVIDIA H100 SXM5 80GB
Reported (Epoch AI or owner data)
Chip count1,528
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 1,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressDenmark
Coordinates55.96340, 10.04630

Power and grid

Nearest high-voltage substation400/150 kV Malling, 400 kV, 11 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Power plants within 50 km908 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity120 g CO₂ per kWh (Denmark, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 56.9%, bioenergy 21.4%, solar 12.8%, oil and other fossil 4.9%, coal 2.5%. Clean power: 91.2%
Industrial power priceEUR 0.118 per kWh (Denmark, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature27.6 °C (2001 to 2025)
Cooling degree days23 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.84 kWh per m² per day
Wind at 50 m7.6 m/s average
Water stress todayLow (<10%) (Denmark)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Novo Nordisk GefionNVIDIA H100 SXM5 80GB1,5282.9 MW2024-10-23

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Novo Nordisk Gefion use?

Public data puts the facility power at about 2.9 MW. Reported (Epoch AI or owner data).

What chips does Novo Nordisk Gefion use?

Reported chips: NVIDIA H100 SXM5 80GB.

How close is Novo Nordisk Gefion to the power grid?

The nearest high-voltage substation in OpenStreetMap is 400/150 kV Malling (400 kV), about 11 km away.

How clean is the power for Novo Nordisk Gefion?

The grid in Denmark emits about 120 g CO₂ per kWh (2025). Largest sources: wind 56.9%, bioenergy 21.4%, solar 12.8%.

Who operates Novo Nordisk Gefion?

Novo Nordisk Foundation,Danish Centre for AI Innovation,Export and Investment Fund of Denmark.

Data centers near Odder

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.