Novo Nordisk Gefion
Novo Nordisk Gefion is an operational AI data center operated by Novo Nordisk Foundation,Danish Centre for AI Innovation,Export and Investment Fund of Denmark in Odder, Denmark. Its power is about 2.9 MW. Epoch AI estimates about 3,032 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | Novo Nordisk Foundation,Danish Centre for AI Innovation,Export and Investment Fund of Denmark |
| Facility power | 2.9 MW Reported (Epoch AI or owner data) |
| AI compute | 3,032 H100-equivalents |
| AI chips | NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 1,528 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Denmark |
| Coordinates | 55.96340, 10.04630 |
Power and grid
| Nearest high-voltage substation | 400/150 kV Malling, 400 kV, 11 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Power plants within 50 km | 908 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 120 g CO₂ per kWh (Denmark, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 56.9%, bioenergy 21.4%, solar 12.8%, oil and other fossil 4.9%, coal 2.5%. Clean power: 91.2% |
| Industrial power price | EUR 0.118 per kWh (Denmark, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 27.6 °C (2001 to 2025) |
| Cooling degree days | 23 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.84 kWh per m² per day |
| Wind at 50 m | 7.6 m/s average |
| Water stress today | Low (<10%) (Denmark) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Novo Nordisk Gefion | NVIDIA H100 SXM5 80GB | 1,528 | 2.9 MW | 2024-10-23 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Novo Nordisk Gefion use?
Public data puts the facility power at about 2.9 MW. Reported (Epoch AI or owner data).
What chips does Novo Nordisk Gefion use?
Reported chips: NVIDIA H100 SXM5 80GB.
How close is Novo Nordisk Gefion to the power grid?
The nearest high-voltage substation in OpenStreetMap is 400/150 kV Malling (400 kV), about 11 km away.
How clean is the power for Novo Nordisk Gefion?
The grid in Denmark emits about 120 g CO₂ per kWh (2025). Largest sources: wind 56.9%, bioenergy 21.4%, solar 12.8%.
Who operates Novo Nordisk Gefion?
Novo Nordisk Foundation,Danish Centre for AI Innovation,Export and Investment Fund of Denmark.
Data centers near Odder
- GlobalConnect Stilling 12.2 km
- Fuzion Skanderborg 12.3 km
- GlobalConnect Hørning 2 12.5 km
- Kolo DK4 Viby J. 18.4 km
- Cibicom Datacenter Aarhus 18.4 km
- Fuzion Aarhus 22.9 km
- Cibicom Datacenter Aarhus North 30.9 km
- Google Data Center Fredericia 51.4 km · 64 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.