NP Rochester
NP Rochester is an operational data center operated by Neutral Path Communications in Rochester, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Neutral Path Communications |
| Networks | 5 networks PeeringDB. |
| Also known as | SFN MN-Rochester |
| Address | 220 S Broadway |
| Coordinates | 44.02087, -92.46258 |
| Website | neutralpath.net |
Power and grid
| Utility | Rochester Public Utilities (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 2.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 344 g CO₂ per kWh (Minnesota, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 25.1%, coal 23%, nuclear 21.5%, gas 20.7%, solar 5.9%. Clean power: 55.8% |
| Industrial power price | USD 0.100 per kWh (Minnesota, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 7.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.6 °C (2001 to 2025) |
| Cooling degree days | 312 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.85 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Medium - High (20-40%) (Minnesota) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for NP Rochester?
The grid in Minnesota emits about 344 g CO₂ per kWh (2025). Largest sources: wind 25.1%, coal 23%, nuclear 21.5%.
Who operates NP Rochester?
Neutral Path Communications.
Data centers near Rochester
- Epic / Mayo Data Center 7.3 km · 6.9 MW
- Project Skyway 26.3 km · 94 MW
- West Wisconsin Telcom data center in Menomonie 104.5 km
More Neutral Path Communications data centers
- NP Belle Plaine (MSP1) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.