Project Skyway

Project Skyway is an operational data center operated by Google in Byron, United States. Our footprint estimate of its power is about 94 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).

Key facts

StatusOperational
OperatorGoogle
Facility power94 MW (range 38 MW to 235 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 783,778 m² site outline x 0.12 kW per m² of land.
AI chipsGoogle TPU (plus NVIDIA GPUs for cloud customers)
Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips.
GPU capacity if all AIabout 40,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates44.21759, -92.64569

Power and grid

UtilityNorthern States Power Co - Minnesota (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineNorthern Natural Gas Co, interstate pipeline, 5.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity344 g CO₂ per kWh (Minnesota, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 25.1%, coal 23%, nuclear 21.5%, gas 20.7%, solar 5.9%. Clean power: 55.8%
Industrial power priceUSD 0.100 per kWh (Minnesota, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature7.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.6 °C (2001 to 2025)
Cooling degree days312 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.85 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayMedium - High (20-40%) (Minnesota)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Project Skyway use?

We estimate the facility power at about 94 MW. Estimate from building footprint, low confidence.

What chips does Project Skyway use?

No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).

How clean is the power for Project Skyway?

The grid in Minnesota emits about 344 g CO₂ per kWh (2025). Largest sources: wind 25.1%, coal 23%, nuclear 21.5%.

Who operates Project Skyway?

Google.