Data Center Directory

Meta Rosemount Data Center

Meta Rosemount Data Center is a data center under construction operated by Meta in Rosemount, United States. Our footprint estimate of its power is about 88 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorMeta
Facility power88 MW (range 35 MW to 220 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 732,299 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 38,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates44.73506, -93.06261

Power and grid

UtilityNorthern States Power Co - Minnesota (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineNorthern Natural Gas Co, interstate pipeline, 2.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity344 g CO₂ per kWh (Minnesota, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 25.1%, coal 23%, nuclear 21.5%, gas 20.7%, solar 5.9%. Clean power: 55.8%
Industrial power priceUSD 0.100 per kWh (Minnesota, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature7.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41 °C (2001 to 2025)
Cooling degree days362 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.85 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayMedium - High (20-40%) (Minnesota)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Meta Rosemount Data Center use?

We estimate the facility power at about 88 MW. Estimate from building footprint, low confidence.

What chips does Meta Rosemount Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

How clean is the power for Meta Rosemount Data Center?

The grid in Minnesota emits about 344 g CO₂ per kWh (2025). Largest sources: wind 25.1%, coal 23%, nuclear 21.5%.

Who operates Meta Rosemount Data Center?

Meta.

Data centers near Rosemount

More Meta data centers

Sources

Correct this page or get the data