Meta Rosemount Data Center is a data center under construction operated by Meta in Rosemount, United States. Our footprint estimate of its power is about 88 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | Meta |
| Facility power | 88 MW (range 35 MW to 220 MW) Estimate from building footprint, low confidence. Footprint estimate: about 732,299 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 38,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 44.73506, -93.06261 |
Power and grid
| Utility | Northern States Power Co - Minnesota (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 2.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 344 g CO₂ per kWh (Minnesota, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 25.1%, coal 23%, nuclear 21.5%, gas 20.7%, solar 5.9%. Clean power: 55.8% |
| Industrial power price | USD 0.100 per kWh (Minnesota, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 7.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41 °C (2001 to 2025) |
| Cooling degree days | 362 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.85 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Medium - High (20-40%) (Minnesota) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta Rosemount Data Center use?
We estimate the facility power at about 88 MW. Estimate from building footprint, low confidence.
What chips does Meta Rosemount Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How clean is the power for Meta Rosemount Data Center?
The grid in Minnesota emits about 344 g CO₂ per kWh (2025). Largest sources: wind 25.1%, coal 23%, nuclear 21.5%.
Who operates Meta Rosemount Data Center?
Meta.
Data centers near Rosemount
- Meta Rosemount 5.0 km · 241 MW
- DataBank Minneapolis (MSP2) 13.2 km
- DataBank Minneapolis (MSP1) 25.5 km
- Verizon - Bloomington Network 26.0 km · 7.4 MW
- H5 Data Centers Minneapolis 27.2 km · 12 MW
- University of Minnesota Agate 30.0 km · 0.2 MW
- Advanced Operations Center 30.1 km · 2.1 MW
- Cologix MIN1 30.3 km · 15 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.