Open DC JB1 - Menara MSC Cyberport
Open DC JB1 - Menara MSC Cyberport is an operational data center operated by OPEN DC SDN BHD in Johor Bahru, Malaysia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | OPEN DC SDN BHD |
| Networks | 15 networks, 2 internet exchanges PeeringDB. |
| Address | Level 16, Menara MSC Cyberport,, 5, Jalan Bukit Meldrum, Tanjung Puteri |
| Coordinates | 1.46296, 103.77173 |
| Website | opendc.my |
Power and grid
| Nearest high-voltage substation | Admiralty West Substation 230kV, 230 kV, 4.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 18 GW in 35 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 601 g CO₂ per kWh (Malaysia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21% |
Climate and water
| Average temperature | 27.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.9 °C (2001 to 2025) |
| Cooling degree days | 3,296 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.82 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low (<10%) (Johor) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Open DC JB1 - Menara MSC Cyberport to the power grid?
The nearest high-voltage substation in OpenStreetMap is Admiralty West Substation 230kV (230 kV), about 4.3 km away.
How clean is the power for Open DC JB1 - Menara MSC Cyberport?
The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.
Who operates Open DC JB1 - Menara MSC Cyberport?
OPEN DC SDN BHD.
Data centers near Johor Bahru
- Open DC JB2 - Menara Ansar 1.0 km
- 1-Net North 2.4 km · 34 MW
- SIN06 DC 3.5 km · 72 MW
- Microsoft data center in Singapore 3.6 km · 77 MW
- Data center in Woodlands 4.8 km · 1.7 MW
- DODID Data Centre 10.4 km
- DayOne Kempas 10.4 km · 590 MW
- Sustainable Metal Cloud Singapore 13.0 km · 1.5 MW
More OPEN DC SDN BHD data centers
- Open DC JB2 - Menara Ansar Malaysia
- Open DC PE1 - Suntech Penang Cybercity Malaysia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.