Data Center Directory

Open DC JB1 - Menara MSC Cyberport

Open DC JB1 - Menara MSC Cyberport is an operational data center operated by OPEN DC SDN BHD in Johor Bahru, Malaysia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorOPEN DC SDN BHD
Networks15 networks, 2 internet exchanges
PeeringDB.
AddressLevel 16, Menara MSC Cyberport,, 5, Jalan Bukit Meldrum, Tanjung Puteri
Coordinates1.46296, 103.77173
Websiteopendc.my

Power and grid

Nearest high-voltage substationAdmiralty West Substation 230kV, 230 kV, 4.3 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km4
Power plants within 50 km18 GW in 35 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity601 g CO₂ per kWh (Malaysia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21%

Climate and water

Average temperature27.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.9 °C (2001 to 2025)
Cooling degree days3,296 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.82 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayLow (<10%) (Johor)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is Open DC JB1 - Menara MSC Cyberport to the power grid?

The nearest high-voltage substation in OpenStreetMap is Admiralty West Substation 230kV (230 kV), about 4.3 km away.

How clean is the power for Open DC JB1 - Menara MSC Cyberport?

The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.

Who operates Open DC JB1 - Menara MSC Cyberport?

OPEN DC SDN BHD.

Data centers near Johor Bahru

More OPEN DC SDN BHD data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.