Data Center Directory

Optus Ultimo

Optus Ultimo is an operational data center operated by Singtel Optus in Sydney, Australia. Our footprint estimate of its power is about 8.1 MW.

Key facts

StatusOperational
OperatorSingtel Optus
Facility power8.1 MW (range 4.1 MW to 13 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,694 m² building outline x 4 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asOptus Data Centre
Address549 Harris St, Ultimo
Coordinates-33.87869, 151.19879
Websiteoptus.com.au

Power and grid

Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature18.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.9 °C (2001 to 2025)
Cooling degree days673 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.65 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Optus Ultimo use?

We estimate the facility power at about 8.1 MW. Estimate from building footprint, low confidence.

How clean is the power for Optus Ultimo?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Optus Ultimo?

Singtel Optus.

Data centers near Sydney

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.