Data Center Directory

Payam Data Recovery

Payam Data Recovery is an operational data center in Sydney, Australia. No power figure is public for this site yet.

Key facts

StatusOperational
AddressCastlereagh Street 133
Opened1998
Coordinates-33.87054, 151.20993
Websitepayam.com.au

Power and grid

Nearest high-voltage substationCity Central Substation, 132 kV, 700 m away (Ausgrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationHaymarket Bulk Supply Substation, 330 kV, 1.4 km away
HV substations within 10 km37
Power plants within 50 km179 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature18.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.9 °C (2001 to 2025)
Cooling degree days673 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.65 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is Payam Data Recovery to the power grid?

The nearest high-voltage substation in OpenStreetMap is City Central Substation (132 kV), about 700 m away.

How clean is the power for Payam Data Recovery?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Data centers near Sydney

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.