Ouiherberg Aimargues
Ouiherberg Aimargues is an operational data center operated by OuiHeberg SARL in Aimargues, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | OuiHeberg SARL |
| Address | 22 Rue du Muscat |
| Coordinates | 43.69085, 4.19802 |
| Website | ouiheberg.com |
Power and grid
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.1 °C (2001 to 2025) |
| Cooling degree days | 595 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.41 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (Occitanie) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Ouiherberg Aimargues?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Ouiherberg Aimargues?
OuiHeberg SARL.
Data centers near Aimargues
- System-Net HDC 1 18.9 km
- NETICENTER 21.5 km
- Datacenter France Travail 24.3 km · 2.3 MW
- Data center in Montpellier 24.6 km · 2.7 MW
- Cogent Montpellier 26.5 km
- GENCI Adastra 27.3 km · 1.6 MW
- UltraEdge Montpellier 28.5 km
- Cogent Montpellier 28.8 km · 1.3 MW