Paratus Armada
Paratus Armada is an operational data center operated by Paratus in Windhoek, Namibia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Paratus |
| Networks | 2 networks PeeringDB. |
| Address | H3P9+56G, Windhoek, Namibia |
| Coordinates | -22.41448, 17.06808 |
| Website | armada.paratus.africa |
Power and grid
| Nearest high-voltage substation | Auas Substation, 400 kV, 36 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Power plants within 50 km | 125 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 52 g CO₂ per kWh (Namibia, 2024) Average of all power made in the area. Ember. |
| Grid power mix | hydro 50.6%, solar 46.4%, coal 2%, wind 1%. Clean power: 98% |
Climate and water
| Average temperature | 19.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 1,060 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 6.33 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Extremely High (>80%) (Namibia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Paratus Armada to the power grid?
The nearest high-voltage substation in OpenStreetMap is Auas Substation (400 kV), about 36 km away.
How clean is the power for Paratus Armada?
The grid in Namibia emits about 52 g CO₂ per kWh (2024). Largest sources: hydro 50.6%, solar 46.4%, coal 2%.
Who operates Paratus Armada?
Paratus.
More Paratus data centers
- Paratus ITA-DC1 Angola
- Paratus Vanguard Zambia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.