Data Center Directory

Paratus ITA-DC1

Paratus ITA-DC1 is an operational data center operated by Paratus in Luanda, Angola. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorParatus
Networks4 networks, 1 internet exchanges
PeeringDB.
Also known asParatus ITA-DC2
AddressRua 29, EPAL 30 - Patriota - Benfica
Coordinates-8.95849, 13.19734
Websiteita.ao

Power and grid

Nearest high-voltage substationSubestação do Camama II, 220 kV, 6.6 km away (Empresa de Distribuição de Electricidade de Luanda (EDEL))
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km499 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity183 g CO₂ per kWh (Angola, 2024)
Average of all power made in the area. Ember.
Grid power mixhydro 69.5%, oil and other fossil 17.1%, gas 8.8%, solar 4.3%. Clean power: 74.1%

Climate and water

Average temperature25.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.1 °C (2001 to 2025)
Cooling degree days2,851 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.83 kWh per m² per day
Wind at 50 m4.2 m/s average
Water stress todayHigh (40-80%) (Luanda)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is Paratus ITA-DC1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestação do Camama II (220 kV), about 6.6 km away.

How clean is the power for Paratus ITA-DC1?

The grid in Angola emits about 183 g CO₂ per kWh (2024). Largest sources: hydro 69.5%, oil and other fossil 17.1%, gas 8.8%.

Who operates Paratus ITA-DC1?

Paratus.

Data centers near Luanda

More Paratus data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.