partimus Rechenzentrum Bad Oeynhausen
partimus Rechenzentrum Bad Oeynhausen is an operational data center operated by partimus in Bad Oeynhausen, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | partimus |
| Networks | 1 networks PeeringDB. |
| Address | Zur Bauernwiese 25, 32549 Bad Oeynhausen |
| Coordinates | 52.23192, 8.80640 |
| Website | partimus.com |
Power and grid
| Nearest high-voltage substation | Rehme, 110 kV, 3 km away (EON_Westfalen_Weser) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Veltheim, 220 kV, 9.6 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 346 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 93 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.85 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is partimus Rechenzentrum Bad Oeynhausen to the power grid?
The nearest high-voltage substation in OpenStreetMap is Rehme (110 kV), about 3 km away.
How clean is the power for partimus Rechenzentrum Bad Oeynhausen?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates partimus Rechenzentrum Bad Oeynhausen?
partimus.
Data centers near Bad Oeynhausen
- DTS DataCenter Herford 16.5 km
- Mittwald CM Service GmbH & Co. KG data center in Espelkamp 21.1 km · 0.7 MW
- BICOS COMPUTER GmbH 29.7 km
- BITel Bielefeld 29.8 km
- euNetworks Colocation Bielefeld 29.9 km
- BITel Gütersloh 44.5 km
- Data center in Gütersloh 45.8 km · 2.2 MW
- YEXIO 50.4 km · 3.5 MW
More partimus data centers
- partimus Rechenzentrum Limburg Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.