Data Center Directory

Regit4u

Regit4u is an operational data center in Hedge End, United Kingdom. Our footprint estimate of its power is about 0.6 MW.

Key facts

StatusOperational
Facility power0.6 MW (range 0.3 MW to 1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 500 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 260 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates50.90674, -1.25002

Power and grid

Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Regit4u use?

We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.

How clean is the power for Regit4u?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Data centers near Hedge End

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.