Data Center Directory

ServerHouse F2

ServerHouse F2 is an operational data center operated by ServerHouse in Fareham, United Kingdom. Our footprint estimate of its power is about 4.4 MW.

Key facts

StatusOperational
OperatorServerHouse
Facility power4.4 MW (range 2.2 MW to 7.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,697 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asAstrohouse · Serverhouse
Address14 Brunel Way, Fareham
Coordinates50.86774, -1.24561
Websiteserverhouse.co.uk

Power and grid

Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.7 °C (2001 to 2025)
Cooling degree days48 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.4 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does ServerHouse F2 use?

We estimate the facility power at about 4.4 MW. Estimate from building footprint, low confidence.

How clean is the power for ServerHouse F2?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates ServerHouse F2?

ServerHouse.

Data centers near Fareham

More ServerHouse data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.