SSE data center in Havant
SSE data center in Havant is an operational data center operated by SSE in Havant, United Kingdom. Our footprint estimate of its power is about 1.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | SSE |
| Facility power | 1.8 MW (range 0.9 MW to 2.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,532 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 770 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Martin Road, PO9 5TH, Havant |
| Coordinates | 50.86642, -0.97568 |
Power and grid
| Nearest high-voltage substation | Havant Substation, 132 kV, 2.7 km away (Scottish and Southern Electricity Networks) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Lovedean Substation, 400 kV, 7.2 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 2.1 GW in 92 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.7 °C (2001 to 2025) |
| Cooling degree days | 48 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.4 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does SSE data center in Havant use?
We estimate the facility power at about 1.8 MW. Estimate from building footprint, low confidence.
How close is SSE data center in Havant to the power grid?
The nearest high-voltage substation in OpenStreetMap is Havant Substation (132 kV), about 2.7 km away.
How clean is the power for SSE data center in Havant?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates SSE data center in Havant?
SSE.
Data centers near Havant
- Aptum Portsmouth 2.4 km
- ServerHouse P1 13.5 km
- ServerHouse F1 13.7 km
- iomart DC9 Gosport 13.9 km
- ServerHouse F2 18.9 km · 4.4 MW
- Neos Networks Hampshire 19.1 km · 8.4 MW
- Regit4u 19.8 km · 0.6 MW
- Sky Chilworth 33.4 km · 4.2 MW