SI Cloud Montpellier
SI Cloud Montpellier is an operational data center operated by SI Cloud SASU in Saint-Clément-de-Rivière, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | SI Cloud SASU |
| Networks | 2 networks PeeringDB. |
| Address | 521 Avenue de Saint-Sauveur |
| Coordinates | 43.71140, 3.83265 |
| Website | si-cloud.fr/datacenter-montpellier |
Power and grid
| Nearest high-voltage substation | Poste électrique des Quatre Seigneurs, 225 kV, 7.2 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 156 MW in 27 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.1 °C (2001 to 2025) |
| Cooling degree days | 595 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.41 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (Occitanie) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is SI Cloud Montpellier to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique des Quatre Seigneurs (225 kV), about 7.2 km away.
How clean is the power for SI Cloud Montpellier?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates SI Cloud Montpellier?
SI Cloud SASU.
Data centers near Saint-Clément-de-Rivière
- Datacenter IBM - Grabels 7.6 km · 5.2 MW
- CINES 8.4 km · 6 MW
- Datacenter France Travail 11.3 km · 2.3 MW
- GENCI Adastra 11.8 km · 1.6 MW
- Data center in Montpellier 11.9 km · 2.7 MW
- Cogent Montpellier 12.2 km
- Cogent Montpellier 12.5 km · 1.3 MW
- UltraEdge Montpellier 13.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.