Southern Highlands Data Campus
Southern Highlands Data Campus is an operational data center operated by Cloud Carrier in Moss Vale, Australia. Our footprint estimate of its power is about 6.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Cloud Carrier |
| Facility power | 6.2 MW (range 3.1 MW to 9.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,174 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Douglas Road 30, 2577 |
| Coordinates | -34.51540, 150.36973 |
| Website | cloudcarrier.com/db1 |
Power and grid
| Nearest high-voltage substation | Fairfax Lane Transmission Substation, 132 kV, 5.3 km away (Endeavour Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Kangaroo Valley Transmission Station, 330 kV, 25.3 km away |
| HV substations within 10 km | 1 |
| Power plants within 50 km | 680 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 427 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.58 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Southern Highlands Data Campus use?
We estimate the facility power at about 6.2 MW. Estimate from building footprint, low confidence.
How close is Southern Highlands Data Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is Fairfax Lane Transmission Substation (132 kV), about 5.3 km away.
How clean is the power for Southern Highlands Data Campus?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Southern Highlands Data Campus?
Cloud Carrier.
Data centers near Moss Vale
- Equinix SY7 - Sydney (formerly Metronode Illawara 1) 45.0 km · 1.4 MW
- AWS Asia Pacific (Sydney) Region Data Centre 64.6 km · 25 MW
- AWS Asia Pacific (Sydney) Region Data Centre 64.6 km · 17 MW