Equinix SY7 - Sydney (formerly Metronode Illawara 1)

Equinix SY7 - Sydney (formerly Metronode Illawara 1) is an operational data center operated by Equinix in Unanderra, Australia. Our footprint estimate of its power is about 1.4 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power1.4 MW (range 0.7 MW to 2.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,176 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks9 networks, 2 internet exchanges
PeeringDB.
Also known asEquinix SY7 - Sydney
Address8 Lathe Place
Coordinates-34.46359, 150.85699
Websiteequinix.com/locations/asia-colocation/australia-colocation/sydney-data-centers/sy7

Power and grid

Nearest high-voltage substationSpring Hill Transmission Station, 132 kV, 600 m away (Endeavour Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationDapto Bulk Supply Substation, 330 kV, 10.5 km away
HV substations within 10 km3
Power plants within 50 km680 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature19.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.6 °C (2001 to 2025)
Cooling degree days597 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.7 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix SY7 - Sydney (formerly Metronode Illawara 1) use?

We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.

How close is Equinix SY7 - Sydney (formerly Metronode Illawara 1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Spring Hill Transmission Station (132 kV), about 600 m away.

How clean is the power for Equinix SY7 - Sydney (formerly Metronode Illawara 1)?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Equinix SY7 - Sydney (formerly Metronode Illawara 1)?

Equinix.