Equinix SY7 - Sydney (formerly Metronode Illawara 1)
Equinix SY7 - Sydney (formerly Metronode Illawara 1) is an operational data center operated by Equinix in Unanderra, Australia. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 1.4 MW (range 0.7 MW to 2.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,176 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 9 networks, 2 internet exchanges PeeringDB. |
| Also known as | Equinix SY7 - Sydney |
| Address | 8 Lathe Place |
| Coordinates | -34.46359, 150.85699 |
| Website | equinix.com/locations/asia-colocation/australia-colocation/sydney-data-centers/sy7 |
Power and grid
| Nearest high-voltage substation | Spring Hill Transmission Station, 132 kV, 600 m away (Endeavour Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Dapto Bulk Supply Substation, 330 kV, 10.5 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 680 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 19.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.6 °C (2001 to 2025) |
| Cooling degree days | 597 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.7 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix SY7 - Sydney (formerly Metronode Illawara 1) use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
How close is Equinix SY7 - Sydney (formerly Metronode Illawara 1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Spring Hill Transmission Station (132 kV), about 600 m away.
How clean is the power for Equinix SY7 - Sydney (formerly Metronode Illawara 1)?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Equinix SY7 - Sydney (formerly Metronode Illawara 1)?
Equinix.
Data centers near Unanderra
- Southern Highlands Data Campus 45.0 km · 6.2 MW
- AWS Asia Pacific (Sydney) Region Data Centre 48.1 km · 25 MW
- AWS Asia Pacific (Sydney) Region Data Centre 48.3 km · 17 MW
- Equinix SY1/SY2 - Sydney 67.5 km · 32 MW
- Equinix SY4 - Sydney 67.9 km · 29 MW
- Vocus Sydney SYD01 68.4 km
- Equinix SY3 - Sydney 68.7 km · 29 MW
- SISDC1-SYD 70.1 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources