AWS Asia Pacific (Sydney) Region Data Centre
AWS Asia Pacific (Sydney) Region Data Centre is an operational data center operated by Amazon Web Services in Currans Hill, Australia. Our footprint estimate of its power is about 17 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Amazon Web Services |
| Facility power | 17 MW (range 8.6 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,356 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Bluett Drive 42A, 2567 |
| Coordinates | -34.03569, 150.76602 |
Power and grid
| Nearest high-voltage substation | Smeaton Grange Switching Substation, 132 kV, 300 m away (Endeavour Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Macarthur Bulk Supply Substation, 330 kV, 5.5 km away |
| HV substations within 10 km | 5 |
| Power plants within 50 km | 229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AWS Asia Pacific (Sydney) Region Data Centre use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
What chips does AWS Asia Pacific (Sydney) Region Data Centre use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
How close is AWS Asia Pacific (Sydney) Region Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is Smeaton Grange Switching Substation (132 kV), about 300 m away.
How clean is the power for AWS Asia Pacific (Sydney) Region Data Centre?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates AWS Asia Pacific (Sydney) Region Data Centre?
Amazon Web Services.
Data centers near Currans Hill
- AWS Asia Pacific (Sydney) Region Data Centre 253 m · 25 MW
- Microsoft SYD06 Data Centre 22.2 km · 20 MW
- Telstra 22.9 km · 24 MW
- Digital Realty Sydney SYD10 24.6 km · 12 MW
- CDC Eastern Creek Campus EC4 25.0 km · 17 MW
- CDC Eastern Creek Campus EC5 25.0 km · 14 MW
- CDC Sydney EC1 25.2 km · 17 MW
- Data center in Minchinbury 25.9 km · 12 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Ridgeland United States
- Amazon Madison Mega Site United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.