Data Center Directory

Microsoft SYD06 Data Centre

Microsoft SYD06 Data Centre is an operational data center operated by Microsoft in Erskine Park, Australia. Our footprint estimate of its power is about 20 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power20 MW (range 10 MW to 32 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 16,807 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 8,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMicrosoft SYD05 Data Centre
Coordinates-33.83628, 150.77557

Power and grid

Nearest high-voltage substationSouth Erskine Park Zone Substation, 132 kV, 2.5 km away (Endeavour Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSydney West Bulk Supply Substation, 330 kV, 5.4 km away
HV substations within 10 km11
Power plants within 50 km229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature18.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.9 °C (2001 to 2025)
Cooling degree days673 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.65 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Microsoft SYD06 Data Centre use?

We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.

What chips does Microsoft SYD06 Data Centre use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Microsoft SYD06 Data Centre to the power grid?

The nearest high-voltage substation in OpenStreetMap is South Erskine Park Zone Substation (132 kV), about 2.5 km away.

How clean is the power for Microsoft SYD06 Data Centre?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Microsoft SYD06 Data Centre?

Microsoft.

Data centers near Erskine Park

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.