Microsoft SYD06 Data Centre is an operational data center operated by Microsoft in Erskine Park, Australia. Our footprint estimate of its power is about 20 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 20 MW (range 10 MW to 32 MW) Estimate from building footprint, low confidence. Footprint estimate: about 16,807 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 8,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Microsoft SYD05 Data Centre |
| Coordinates | -33.83628, 150.77557 |
Power and grid
| Nearest high-voltage substation | South Erskine Park Zone Substation, 132 kV, 2.5 km away (Endeavour Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Sydney West Bulk Supply Substation, 330 kV, 5.4 km away |
| HV substations within 10 km | 11 |
| Power plants within 50 km | 229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft SYD06 Data Centre use?
We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.
What chips does Microsoft SYD06 Data Centre use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft SYD06 Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is South Erskine Park Zone Substation (132 kV), about 2.5 km away.
How clean is the power for Microsoft SYD06 Data Centre?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Microsoft SYD06 Data Centre?
Microsoft.
Data centers near Erskine Park
- Telstra 1.9 km · 24 MW
- Digital Realty Sydney SYD10 2.9 km · 12 MW
- CDC Eastern Creek Campus EC5 6.0 km · 14 MW
- CDC Eastern Creek Campus EC4 6.1 km · 17 MW
- CDC Sydney EC1 6.2 km · 17 MW
- Data center in Minchinbury 6.5 km · 12 MW
- AWS Asia Pacific (Sydney) Region Data Centre 6.6 km · 10 MW
- AWS Asia Pacific (Sydney) Region Data Centre 9.8 km · 14 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.