Data Center Directory

Equinix SY1/SY2 - Sydney

Equinix SY1/SY2 - Sydney is an operational data center operated by Equinix in Sydney, Australia. Our footprint estimate of its power is about 32 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power32 MW (range 16 MW to 50 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,763 m² building outline x 3 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 14,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks203 networks, 5 internet exchanges
PeeringDB.
Also known asEquinix International Business Exchange SY2 Data Center · Equinix International Business Exchange SY1 Data Center
Address639 Gardeners Road, Mascot
Coordinates-33.92187, 151.18803
Websiteequinix.com/locations/asia-colocation/australia-colocation/sydney-data-centers

Power and grid

Nearest high-voltage substationBeaconsfield South Bulk Supply Substation, 330 kV, 700 m away (TransGrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km36
Power plants within 50 km179 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature18.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.9 °C (2001 to 2025)
Cooling degree days673 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.65 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix SY1/SY2 - Sydney use?

We estimate the facility power at about 32 MW. Estimate from building footprint, low confidence.

How close is Equinix SY1/SY2 - Sydney to the power grid?

The nearest high-voltage substation in OpenStreetMap is Beaconsfield South Bulk Supply Substation (330 kV), about 700 m away.

How clean is the power for Equinix SY1/SY2 - Sydney?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Equinix SY1/SY2 - Sydney?

Equinix.

Data centers near Sydney

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.