Equinix SY1/SY2 - Sydney
Equinix SY1/SY2 - Sydney is an operational data center operated by Equinix in Sydney, Australia. Our footprint estimate of its power is about 32 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 32 MW (range 16 MW to 50 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,763 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 14,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 203 networks, 5 internet exchanges PeeringDB. |
| Also known as | Equinix International Business Exchange SY2 Data Center · Equinix International Business Exchange SY1 Data Center |
| Address | 639 Gardeners Road, Mascot |
| Coordinates | -33.92187, 151.18803 |
| Website | equinix.com/locations/asia-colocation/australia-colocation/sydney-data-centers |
Power and grid
| Nearest high-voltage substation | Beaconsfield South Bulk Supply Substation, 330 kV, 700 m away (TransGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 36 |
| Power plants within 50 km | 179 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix SY1/SY2 - Sydney use?
We estimate the facility power at about 32 MW. Estimate from building footprint, low confidence.
How close is Equinix SY1/SY2 - Sydney to the power grid?
The nearest high-voltage substation in OpenStreetMap is Beaconsfield South Bulk Supply Substation (330 kV), about 700 m away.
How clean is the power for Equinix SY1/SY2 - Sydney?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Equinix SY1/SY2 - Sydney?
Equinix.
Data centers near Sydney
- Equinix SY4 - Sydney 425 m · 29 MW
- Vocus Sydney SYD01 902 m
- Equinix SY3 - Sydney 1.2 km · 29 MW
- SISDC1-SYD 2.6 km
- AAPT Glebe 4.3 km
- Intellicentre 1 (IC1) 4.9 km
- Optus Ultimo 4.9 km · 8.1 MW
- DigiCo Sydney SYD1 (formerly Global Switch Australia) 5.2 km · 76 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data