Star of Bosphorus Veri Merkezi is an operational data center operated by NGN in Tuzla, Türkiye. Our footprint estimate of its power is about 28 MW.

Key facts

StatusOperational
OperatorNGN
Facility power28 MW (range 14 MW to 45 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 23,569 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 12,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressHidayet Caddesi, Tuzla
Coordinates40.89131, 29.40306
Websitestarofbosphorus.com.tr

Power and grid

Nearest high-voltage substationTepeören TM, 400 kV, 300 m away (TEİAŞ)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
Power plants within 50 km1.5 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity476 g CO₂ per kWh (Türkiye, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 34.3%, gas 22.1%, hydro 16.2%, wind 11.1%, solar 10.5%. Clean power: 43.3%
Industrial power priceEUR 0.054 per kWh (Türkiye, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature14.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days648 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.05 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayMedium - High (20-40%) (Kocaeli)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Star of Bosphorus Veri Merkezi use?

We estimate the facility power at about 28 MW. Estimate from building footprint, low confidence.

How close is Star of Bosphorus Veri Merkezi to the power grid?

The nearest high-voltage substation in OpenStreetMap is Tepeören TM (400 kV), about 300 m away.

How clean is the power for Star of Bosphorus Veri Merkezi?

The grid in Türkiye emits about 476 g CO₂ per kWh (2025). Largest sources: coal 34.3%, gas 22.1%, hydro 16.2%.

Who operates Star of Bosphorus Veri Merkezi?

NGN.

Data centers near Tuzla

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.