Star of Bosphorus Veri Merkezi is an operational data center operated by NGN in Tuzla, Türkiye. Our footprint estimate of its power is about 28 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NGN |
| Facility power | 28 MW (range 14 MW to 45 MW) Estimate from building footprint, low confidence. Footprint estimate: about 23,569 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Hidayet Caddesi, Tuzla |
| Coordinates | 40.89131, 29.40306 |
| Website | starofbosphorus.com.tr |
Power and grid
| Nearest high-voltage substation | Tepeören TM, 400 kV, 300 m away (TEİAŞ) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 1.5 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 476 g CO₂ per kWh (Türkiye, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 34.3%, gas 22.1%, hydro 16.2%, wind 11.1%, solar 10.5%. Clean power: 43.3% |
| Industrial power price | EUR 0.054 per kWh (Türkiye, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 14.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 648 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.05 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Medium - High (20-40%) (Kocaeli) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Star of Bosphorus Veri Merkezi use?
We estimate the facility power at about 28 MW. Estimate from building footprint, low confidence.
How close is Star of Bosphorus Veri Merkezi to the power grid?
The nearest high-voltage substation in OpenStreetMap is Tepeören TM (400 kV), about 300 m away.
How clean is the power for Star of Bosphorus Veri Merkezi?
The grid in Türkiye emits about 476 g CO₂ per kWh (2025). Largest sources: coal 34.3%, gas 22.1%, hydro 16.2%.
Who operates Star of Bosphorus Veri Merkezi?
NGN.
Data centers near Tuzla
- Turkcell Gebze Veri Merkezi 8.3 km · 21 MW
- Kaynarca Santrali 11.2 km · 0.9 MW
- Turkcell Kartal Veri Merkezi 16.2 km · 3.6 MW
- Equinix IL2 - Istanbul 22.2 km
- Kuzey Veri Merkezi 24.0 km
- Equinix IL4 - Istanbul 24.5 km
- Yöncü Bilişim Çözümleri 24.6 km
- Teknotel - Kucukyali 25.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.