Turkcell Gebze Veri Merkezi
Turkcell Gebze Veri Merkezi is an operational data center operated by Turkcell Superonline in Gebze, Türkiye. Our footprint estimate of its power is about 21 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Turkcell Superonline |
| Facility power | 21 MW (range 11 MW to 34 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,877 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.82340, 29.44526 |
Power and grid
| Nearest high-voltage substation | Kroman Çelik TM, 154 kV, 6.6 km away (TEİAŞ) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Çolakoğlu 380 TM, 400 kV, 8.4 km away |
| HV substations within 10 km | 11 |
| Power plants within 50 km | 1.5 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 476 g CO₂ per kWh (Türkiye, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 34.3%, gas 22.1%, hydro 16.2%, wind 11.1%, solar 10.5%. Clean power: 43.3% |
| Industrial power price | EUR 0.054 per kWh (Türkiye, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 14.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 648 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.05 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Medium - High (20-40%) (Kocaeli) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Turkcell Gebze Veri Merkezi use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
How close is Turkcell Gebze Veri Merkezi to the power grid?
The nearest high-voltage substation in OpenStreetMap is Kroman Çelik TM (154 kV), about 6.6 km away.
How clean is the power for Turkcell Gebze Veri Merkezi?
The grid in Türkiye emits about 476 g CO₂ per kWh (2025). Largest sources: coal 34.3%, gas 22.1%, hydro 16.2%.
Who operates Turkcell Gebze Veri Merkezi?
Turkcell Superonline.
Data centers near Gebze
- Star of Bosphorus Veri Merkezi 8.3 km · 28 MW
- Kaynarca Santrali 15.9 km · 0.9 MW
- Turkcell Kartal Veri Merkezi 21.5 km · 3.6 MW
- Equinix IL2 - Istanbul 29.5 km
- Teknotel - Kucukyali 31.4 km
- Kuzey Veri Merkezi 31.7 km
- Equinix IL4 - Istanbul 31.8 km
- Yöncü Bilişim Çözümleri 31.9 km
Sources
Correct this page or get the data