Data Center Directory

Stellanor London West

Stellanor London West is an operational data center operated by Stellanor in Hounslow, United Kingdom. Our footprint estimate of its power is about 19 MW.

Key facts

StatusOperational
OperatorStellanor
Facility power19 MW (range 9.5 MW to 30 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 15,841 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressGreen Lane Unit B, TW4 6ER, Hounslow
Coordinates51.46830, -0.39741

Power and grid

Nearest high-voltage substationEast Bedfont Substation, 132 kV, 3.5 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationNorth Hyde Substation, 275 kV, 3.6 km away
HV substations within 10 km9
Power plants within 50 km2.4 GW in 85 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.9 °C (2001 to 2025)
Cooling degree days53 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Stellanor London West use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.

How close is Stellanor London West to the power grid?

The nearest high-voltage substation in OpenStreetMap is East Bedfont Substation (132 kV), about 3.5 km away.

How clean is the power for Stellanor London West?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Stellanor London West?

Stellanor.

Data centers near Hounslow

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.