Morgan Stanley Data Centre
Morgan Stanley Data Centre is an operational data center operated by Morgan Stanley in Hounslow, United Kingdom. Our footprint estimate of its power is about 55 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Morgan Stanley |
| Facility power | 55 MW (range 27 MW to 88 MW) Estimate from building footprint, low confidence. Footprint estimate: about 45,625 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 24,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Heathrow Corporate Park, Hounslow |
| Coordinates | 51.46662, -0.39638 |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.9 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Morgan Stanley Data Centre use?
We estimate the facility power at about 55 MW. Estimate from building footprint, low confidence.
How clean is the power for Morgan Stanley Data Centre?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Morgan Stanley Data Centre?
Morgan Stanley.
Data centers near Hounslow
- Stellanor London West 200 m · 19 MW
- Sungard AS London Technology Centre 226 m
- Verizon UK4 1.2 km · 5.6 MW
- BA Boadicea House Data Centre 1.9 km · 5 MW
- VIRTUS LONDON2 3.4 km · 8.6 MW
- Data center in Hayes 4.0 km · 5.1 MW
- Rackspace London 8 4.5 km · 4.9 MW
- DataBank London (LHR1) 4.5 km
More Morgan Stanley data centers
- Segro Croydon (Morgan Stanley) United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.