T‑Mobile Polska centrum danych
T‑Mobile Polska centrum danych is an operational data center in Grzegórzki, Poland. Our footprint estimate of its power is about 2.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.1 MW (range 1 MW to 3.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,725 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 50.03940, 20.02447 |
Power and grid
| Nearest high-voltage substation | Stacja elektroenergetyczna 110/15 kV „GPZ Płaszów”, 110 kV, 1.2 km away (Tauron) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Stacja elektroenergetyczna 220/110 kV „SE Wanda”, 220 kV, 4.6 km away |
| HV substations within 10 km | 34 |
| Power plants within 50 km | 924 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.4 °C (2001 to 2025) |
| Cooling degree days | 179 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.07 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does T‑Mobile Polska centrum danych use?
We estimate the facility power at about 2.1 MW. Estimate from building footprint, low confidence.
How close is T‑Mobile Polska centrum danych to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15 kV „GPZ Płaszów” (110 kV), about 1.2 km away.
How clean is the power for T‑Mobile Polska centrum danych?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Data centers near Grzegórzki
- Dabka Data Center 1.4 km
- Orange Polska // Kraków 6.1 km
- DISKUS Polska 6.5 km
- S-NET KRAKOW DATA CENTER KRDC-2 8.2 km
- Connected Krakow 8.7 km
- WNET DC Krakow 8.8 km
- AGH Cyfronet Helios 8.9 km · 0.5 MW
- Netia Data Center SOUL 9.4 km