T‑Mobile Polska centrum danych

T‑Mobile Polska centrum danych is an operational data center in Grzegórzki, Poland. Our footprint estimate of its power is about 2.1 MW.

Key facts

StatusOperational
Facility power2.1 MW (range 1 MW to 3.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,725 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates50.03940, 20.02447

Power and grid

Nearest high-voltage substationStacja elektroenergetyczna 110/15 kV „GPZ Płaszów”, 110 kV, 1.2 km away (Tauron)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStacja elektroenergetyczna 220/110 kV „SE Wanda”, 220 kV, 4.6 km away
HV substations within 10 km34
Power plants within 50 km924 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.4 °C (2001 to 2025)
Cooling degree days179 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.07 kWh per m² per day
Wind at 50 m5.8 m/s average
Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does T‑Mobile Polska centrum danych use?

We estimate the facility power at about 2.1 MW. Estimate from building footprint, low confidence.

How close is T‑Mobile Polska centrum danych to the power grid?

The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15 kV „GPZ Płaszów” (110 kV), about 1.2 km away.

How clean is the power for T‑Mobile Polska centrum danych?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.