T-Mobile Warszawa-Szlachecka

T-Mobile Warszawa-Szlachecka is an operational data center in Warszawa, Poland. Our footprint estimate of its power is about 5.9 MW.

Key facts

StatusOperational
Facility power5.9 MW (range 3 MW to 9.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,641 m² building outline x 3 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSzlachecka 49, 03-259, Warszawa
Coordinates52.31529, 21.02186

Power and grid

Nearest high-voltage substationStacja elektroenergetyczna 110/15 kV „RPZ Białołęka”, 110 kV, 1.7 km away (Stoen Operator)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStacja elektroenergetyczna 220/110 kV „SE Praga”, 220 kV, 3.1 km away
HV substations within 10 km31
Power plants within 50 km1.4 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.5 °C (2001 to 2025)
Cooling degree days164 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.98 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does T-Mobile Warszawa-Szlachecka use?

We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.

How close is T-Mobile Warszawa-Szlachecka to the power grid?

The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15 kV „RPZ Białołęka” (110 kV), about 1.7 km away.

How clean is the power for T-Mobile Warszawa-Szlachecka?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.