T-Mobile Warszawa-Szlachecka
T-Mobile Warszawa-Szlachecka is an operational data center in Warszawa, Poland. Our footprint estimate of its power is about 5.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.9 MW (range 3 MW to 9.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,641 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Szlachecka 49, 03-259, Warszawa |
| Coordinates | 52.31529, 21.02186 |
Power and grid
| Nearest high-voltage substation | Stacja elektroenergetyczna 110/15 kV „RPZ Białołęka”, 110 kV, 1.7 km away (Stoen Operator) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Stacja elektroenergetyczna 220/110 kV „SE Praga”, 220 kV, 3.1 km away |
| HV substations within 10 km | 31 |
| Power plants within 50 km | 1.4 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.5 °C (2001 to 2025) |
| Cooling degree days | 164 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does T-Mobile Warszawa-Szlachecka use?
We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.
How close is T-Mobile Warszawa-Szlachecka to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15 kV „RPZ Białołęka” (110 kV), about 1.7 km away.
How clean is the power for T-Mobile Warszawa-Szlachecka?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Data centers near Warszawa
- Centrum Technologii ICM UW 700 m · 5.8 MW
- 3S Data Center Warsaw 1.6 km
- DC 11.11 5.6 km · 1.2 MW
- Vantage Warsaw WAW1 7.3 km · 3.7 MW
- LIM Warsaw 9.8 km
- Orange Polska / Warsaw św. Barbary 10 9.8 km
- Equinix WA1 - Warsaw, Centrum LIM 9.9 km
- EdgeConneX Warsaw (EDCWAW01) 10.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.