Vantage Warsaw WAW1 is an operational data center operated by Vantage Data Centers in Warszawa, Poland. Our footprint estimate of its power is about 3.7 MW.

Key facts

StatusOperational
OperatorVantage Data Centers
Facility power3.7 MW (range 1.5 MW to 9.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 31,040 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressZgrupowania AK „Kampinos” 42D, 01-943, Warszawa
Coordinates52.29304, 20.92159
Websitevantage-dc.com/data-center-locations/emea/warsaw-poland

Power and grid

Nearest high-voltage substationStacja Elektroenergetyczna 110kV RPZ Kasprowicza Serwerownia, 110 kV, 200 m away (STOEN Operator)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStacja elektroenergetyczna 400/110 kV „SE Mościska”, 400 kV, 2.8 km away
HV substations within 10 km31
Power plants within 50 km1.4 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.5 °C (2001 to 2025)
Cooling degree days164 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.98 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Vantage Warsaw WAW1 use?

We estimate the facility power at about 3.7 MW. Estimate from building footprint, low confidence.

How close is Vantage Warsaw WAW1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Stacja Elektroenergetyczna 110kV RPZ Kasprowicza Serwerownia (110 kV), about 200 m away.

How clean is the power for Vantage Warsaw WAW1?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.

Who operates Vantage Warsaw WAW1?

Vantage Data Centers.

Data centers near Warszawa

More Vantage Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.