Data Center Directory

Telecentro - Lomas del Mirador

Telecentro - Lomas del Mirador is an operational data center operated by Telecentro in Lomas del Mirador, Argentina. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorTelecentro
Networks1 networks
PeeringDB.
AddressCoronel Pringles 3407
Coordinates-34.67162, -58.53745
Websitetelecentro.com.ar/empresas/datacenter

Power and grid

Nearest high-voltage substationSubestación Ramos Mejía, 132 kV, 5 km away (Edenor)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestación Malaver, 220 kV, 12.3 km away
HV substations within 10 km7
Power plants within 50 km6.7 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity345 g CO₂ per kWh (Argentina, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41%

Climate and water

Average temperature16.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.1 °C (2001 to 2025)
Cooling degree days740 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.79 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayLow (<10%) (Buenos Aires)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Telecentro - Lomas del Mirador to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación Ramos Mejía (132 kV), about 5 km away.

How clean is the power for Telecentro - Lomas del Mirador?

The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.

Who operates Telecentro - Lomas del Mirador?

Telecentro.

Data centers near Lomas del Mirador

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.