Teledata Manchester - Delta House
Teledata Manchester - Delta House is an operational data center operated by Teledata UK in Manchester, United Kingdom. Our footprint estimate of its power is about 3.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Teledata UK |
| Facility power | 3.4 MW (range 1.7 MW to 5.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,848 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 34 networks, 1 internet exchanges PeeringDB. |
| Also known as | Datum Datacentres (MCR2) · Delta House |
| Address | Delta House, Wavell Road |
| Coordinates | 53.37912, -2.25854 |
| Website | teledata.co.uk |
Power and grid
| Nearest high-voltage substation | Moss Nook, 132 kV, 2.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | South Manchester Substation, 275 kV, 4.8 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 3.3 GW in 82 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 28 °C (2001 to 2025) |
| Cooling degree days | 7 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.75 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Teledata Manchester - Delta House use?
We estimate the facility power at about 3.4 MW. Estimate from building footprint, low confidence.
How close is Teledata Manchester - Delta House to the power grid?
The nearest high-voltage substation in OpenStreetMap is Moss Nook (132 kV), about 2.3 km away.
How clean is the power for Teledata Manchester - Delta House?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Teledata Manchester - Delta House?
Teledata UK.
Data centers near Manchester
- CDL Strata Campus Data Centre 6.2 km · 0.6 MW
- Greenheys 9.2 km
- Equinix MA4 - Manchester, Synergy House 9.3 km
- The UK Grid Network LTD (Greenheys DC) 9.4 km
- Equinix MA1 - Manchester, Williams/Kilburn 9.4 km
- Volta Manchester 9.5 km · 3.9 MW
- iomart DC6 Turing House 9.5 km
- ANS - MAN5 10.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.