The Portal Data Centre (Flexiscale DC 1)

The Portal Data Centre (Flexiscale DC 1) is an operational data center operated by Flexiscale Technologies in Nottingham, United Kingdom. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorFlexiscale Technologies
AddressPortal Retail & Business Park, Queens Drive
Coordinates52.94382, -1.15762
Websiteflexiscale.com

Power and grid

Nearest high-voltage substationNottingham Substation, 132 kV, 1.4 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStoke Bardolph Substation, 400 kV, 7.4 km away
HV substations within 10 km6
Power plants within 50 km3.9 GW in 150 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature9.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.5 °C (2001 to 2025)
Cooling degree days14 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.73 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is The Portal Data Centre (Flexiscale DC 1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Nottingham Substation (132 kV), about 1.4 km away.

How clean is the power for The Portal Data Centre (Flexiscale DC 1)?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates The Portal Data Centre (Flexiscale DC 1)?

Flexiscale Technologies.