Santander data center in Enderby
Santander data center in Enderby is an operational data center operated by Santander in Enderby, United Kingdom. Our footprint estimate of its power is about 8.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Santander |
| Facility power | 8.8 MW (range 4.4 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,332 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 52.58338, -1.20898 |
Power and grid
| Nearest high-voltage substation | Carlton Park Substation, 132 kV, 100 m away (National Grid Electricity Distribution Plc) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Enderby Substation, 400 kV, 1.7 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 2.4 GW in 116 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.6 °C (2001 to 2025) |
| Cooling degree days | 21 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.88 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Santander data center in Enderby use?
We estimate the facility power at about 8.8 MW. Estimate from building footprint, low confidence.
How close is Santander data center in Enderby to the power grid?
The nearest high-voltage substation in OpenStreetMap is Carlton Park Substation (132 kV), about 100 m away.
How clean is the power for Santander data center in Enderby?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Santander data center in Enderby?
Santander.
Data centers near Enderby
- Santander data center in Narborough 457 m · 7.7 MW
- Santander data center in Narborough 505 m · 7.6 MW
- Data center in Hinckley 12.6 km
- UK Servers Coventry 32.4 km
- Servacus DC02 32.8 km
- Experian 33.2 km · 13 MW
- CWCS DCN3 38.2 km
- The Horizon Centre 38.8 km · 21 MW
More Santander data centers
- Santander data center in Narborough United Kingdom
- Santander data center in Narborough United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.