Key facts

StatusOperational
OperatorSantander
Facility power7.6 MW (range 3.8 MW to 12 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,294 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates52.57889, -1.21003

Power and grid

Nearest high-voltage substationCarlton Park Substation, 132 kV, 600 m away (National Grid Electricity Distribution Plc)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationEnderby Substation, 400 kV, 2.2 km away
HV substations within 10 km6
Power plants within 50 km2.4 GW in 115 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature9.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.6 °C (2001 to 2025)
Cooling degree days21 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.88 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Santander data center in Narborough use?

We estimate the facility power at about 7.6 MW. Estimate from building footprint, low confidence.

How close is Santander data center in Narborough to the power grid?

The nearest high-voltage substation in OpenStreetMap is Carlton Park Substation (132 kV), about 600 m away.

How clean is the power for Santander data center in Narborough?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Santander data center in Narborough?

Santander.

Data centers near Narborough

More Santander data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.