Data Center Directory

The Horizon Centre

The Horizon Centre is an operational data center in Corby, United Kingdom. Our footprint estimate of its power is about 21 MW.

Key facts

StatusOperational
Facility power21 MW (range 10 MW to 33 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 17,290 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 9,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates52.51602, -0.64590

Power and grid

Nearest high-voltage substationCorby North Substation, 132 kV, 2.5 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationMarket Harborough Substation, 400 kV, 17.2 km away
HV substations within 10 km2
Power plants within 50 km3.1 GW in 75 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature9.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.2 °C (2001 to 2025)
Cooling degree days27 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.88 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does The Horizon Centre use?

We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.

How close is The Horizon Centre to the power grid?

The nearest high-voltage substation in OpenStreetMap is Corby North Substation (132 kV), about 2.5 km away.

How clean is the power for The Horizon Centre?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Data centers near Corby

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.