Data Center Directory

Hellermann Tyton Data

Hellermann Tyton Data is an operational data center in Northampton, United Kingdom. Our footprint estimate of its power is about 2.7 MW.

Key facts

StatusOperational
Facility power2.7 MW (range 1.4 MW to 4.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,283 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressEdgar Mobbs Way, NN5 5JE, Northampton
Coordinates52.23419, -0.91903

Power and grid

Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature9.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.2 °C (2001 to 2025)
Cooling degree days33 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.88 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Hellermann Tyton Data use?

We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.

How clean is the power for Hellermann Tyton Data?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Data centers near Northampton

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.