Hellermann Tyton Data
Hellermann Tyton Data is an operational data center in Northampton, United Kingdom. Our footprint estimate of its power is about 2.7 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.7 MW (range 1.4 MW to 4.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,283 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Edgar Mobbs Way, NN5 5JE, Northampton |
| Coordinates | 52.23419, -0.91903 |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.2 °C (2001 to 2025) |
| Cooling degree days | 33 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.88 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Hellermann Tyton Data use?
We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.
How clean is the power for Hellermann Tyton Data?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Data centers near Northampton
- Servacus DC02 22.4 km
- nLighten Milton Keynes LTN1 22.4 km
- nLighten Milton Keynes 22.4 km · 7.6 MW
- Pulsant data center in Milton Keynes 22.8 km · 4.7 MW
- The Horizon Centre 36.4 km · 21 MW
- Creslow Park 38.9 km
- Data center in Aylesbury 39.1 km · 1.1 MW
- Santander data center in Narborough 43.1 km · 7.7 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.