Thésée DataCenter is an operational data center operated by Thésée in Aubergenville, France. Our footprint estimate of its power is about 2.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Thésée |
| Facility power | 2.5 MW (range 1.2 MW to 4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,075 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.96605, 1.84030 |
Power and grid
| Nearest high-voltage substation | Poste électrique des Mureaux, 225 kV, 5 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 1.3 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 106 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Thésée DataCenter use?
We estimate the facility power at about 2.5 MW. Estimate from building footprint, low confidence.
How close is Thésée DataCenter to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique des Mureaux (225 kV), about 5 km away.
How clean is the power for Thésée DataCenter?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Thésée DataCenter?
Thésée.
Data centers near Aubergenville
- Datacenter Bouygues Télécom 14.9 km · 1.2 MW
- Site technique SFR 17.2 km · 4.8 MW
- Datacenter des Douanes 19.2 km · 2.7 MW
- Allianz data center in Élancourt 20.7 km · 7.3 MW
- Airbus data center in Élancourt 21.0 km · 17 MW
- Dataxion France DTX01 21.6 km
- OPCORE DC6-2 21.6 km · 12 MW
- Datacenter Thales Nungesser 21.8 km