Türk Telekom Esenyurt Veri Merkezi
Türk Telekom Esenyurt Veri Merkezi is an operational data center operated by Türk Telekom in Esenyurt, Türkiye. Our footprint estimate of its power is about 28 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Türk Telekom |
| Facility power | 28 MW (range 14 MW to 44 MW) Estimate from building footprint, low confidence. Footprint estimate: about 22,983 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.07195, 28.65733 |
Power and grid
| Nearest high-voltage substation | Bahçeşehir TM, 154 kV, 3.4 km away (TEİAŞ) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Deliklikaya GİS Trafo Merkezi, 400 kV, 5.8 km away |
| HV substations within 10 km | 5 |
| Power plants within 50 km | 2.2 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 476 g CO₂ per kWh (Türkiye, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 34.3%, gas 22.1%, hydro 16.2%, wind 11.1%, solar 10.5%. Clean power: 43.3% |
| Industrial power price | EUR 0.054 per kWh (Türkiye, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.1 °C (2001 to 2025) |
| Cooling degree days | 730 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.01 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | High (40-80%) (Istanbul) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Türk Telekom Esenyurt Veri Merkezi use?
We estimate the facility power at about 28 MW. Estimate from building footprint, low confidence.
How close is Türk Telekom Esenyurt Veri Merkezi to the power grid?
The nearest high-voltage substation in OpenStreetMap is Bahçeşehir TM (154 kV), about 3.4 km away.
How clean is the power for Türk Telekom Esenyurt Veri Merkezi?
The grid in Türkiye emits about 476 g CO₂ per kWh (2025). Largest sources: coal 34.3%, gas 22.1%, hydro 16.2%.
Who operates Türk Telekom Esenyurt Veri Merkezi?
Türk Telekom.
Data centers near Esenyurt
- Vodafone Esenyurt MTX 2.8 km · 7.2 MW
- Verizon Istanbul 16.7 km · 3.4 MW
- Turk Telekom Atakoy Santrali 19.8 km
- PremierDC Veri Merkezi A.S. - Istanbul 23.4 km
- Turk Telekom Gayrettepe IDC 28.9 km
- Netbone Datacenter İstanbul 28.9 km
- TurkNet Iletisim Hizmetleri A.S 29.1 km
- intibu - istanbul 29.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.