Vodafone Esenyurt MTX
Vodafone Esenyurt MTX is an operational data center operated by VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI in Esenyurt, Türkiye. Our footprint estimate of its power is about 7.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI |
| Facility power | 7.2 MW (range 3.6 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,991 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 18 networks, 1 internet exchanges PeeringDB. |
| Also known as | Vodafone Esenyurt Veri Merkezi |
| Address | Selahattin Eyyubi (Örnek) Mah., Erzurum Kongre Cad. No:8 |
| Coordinates | 41.04879, 28.67127 |
| Website | vodafone.com.tr |
Power and grid
| Nearest high-voltage substation | TEİAŞ Örnek Mobil Trafo Merkezi, 154 kV, 2.4 km away (TEİAŞ) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Ambarlı DGKÇS TM, 380 kV, 7.5 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 2.2 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 476 g CO₂ per kWh (Türkiye, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 34.3%, gas 22.1%, hydro 16.2%, wind 11.1%, solar 10.5%. Clean power: 43.3% |
| Industrial power price | EUR 0.054 per kWh (Türkiye, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.1 °C (2001 to 2025) |
| Cooling degree days | 730 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.01 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | High (40-80%) (Istanbul) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vodafone Esenyurt MTX use?
We estimate the facility power at about 7.2 MW. Estimate from building footprint, low confidence.
How close is Vodafone Esenyurt MTX to the power grid?
The nearest high-voltage substation in OpenStreetMap is TEİAŞ Örnek Mobil Trafo Merkezi (154 kV), about 2.4 km away.
How clean is the power for Vodafone Esenyurt MTX?
The grid in Türkiye emits about 476 g CO₂ per kWh (2025). Largest sources: coal 34.3%, gas 22.1%, hydro 16.2%.
Who operates Vodafone Esenyurt MTX?
VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI.
Data centers near Esenyurt
- Türk Telekom Esenyurt Veri Merkezi 2.8 km · 28 MW
- Verizon Istanbul 14.4 km · 3.4 MW
- Turk Telekom Atakoy Santrali 17.5 km
- PremierDC Veri Merkezi A.S. - Istanbul 21.9 km
- Turk Telekom Gayrettepe IDC 27.7 km
- Netbone Datacenter İstanbul 27.9 km
- TurkNet Iletisim Hizmetleri A.S 28.1 km
- intibu - istanbul 28.4 km
More VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI data centers
- Vodafone Pursaklar MTX Türkiye