Verizon Istanbul is an operational data center operated by Verizon Communications in Istanbul, Türkiye. Our footprint estimate of its power is about 3.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Verizon Communications |
| Facility power | 3.4 MW (range 1.7 MW to 5.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 563 m² building outline x 5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 50 networks, 4 internet exchanges PeeringDB. |
| Also known as | MedNautilus Istanbul · Teknotel - Yenibosna · Mediterranean Nautilus Telekomunikasyon Hizmetleri Ticaret A.Ş. Veri Merkezi · Turkcell Superonline Yenibosna Veri Merkezi · Verizon İstanbul Veri Merkezi |
| Address | Cobancesme Mah. Kimiz Sk. No 30, Yenibosna |
| Coordinates | 40.99353, 28.82707 |
| Website | verizonenterprise.com |
Power and grid
| Nearest high-voltage substation | Yenibosna TM, 400 kV, 400 m away (TEİAŞ) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 14 |
| Power plants within 50 km | 2.3 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 476 g CO₂ per kWh (Türkiye, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 34.3%, gas 22.1%, hydro 16.2%, wind 11.1%, solar 10.5%. Clean power: 43.3% |
| Industrial power price | EUR 0.054 per kWh (Türkiye, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.1 °C (2001 to 2025) |
| Cooling degree days | 730 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.05 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | High (40-80%) (Istanbul) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Verizon Istanbul use?
We estimate the facility power at about 3.4 MW. Estimate from building footprint, low confidence.
How close is Verizon Istanbul to the power grid?
The nearest high-voltage substation in OpenStreetMap is Yenibosna TM (400 kV), about 400 m away.
How clean is the power for Verizon Istanbul?
The grid in Türkiye emits about 476 g CO₂ per kWh (2025). Largest sources: coal 34.3%, gas 22.1%, hydro 16.2%.
Who operates Verizon Istanbul?
Verizon Communications.
Data centers near Istanbul
- Turk Telekom Atakoy Santrali 3.1 km
- PremierDC Veri Merkezi A.S. - Istanbul 10.1 km
- Vodafone Esenyurt MTX 14.4 km · 7.2 MW
- Turk Telekom Gayrettepe IDC 16.6 km
- Türk Telekom Esenyurt Veri Merkezi 16.7 km · 28 MW
- Netbone Datacenter İstanbul 17.0 km
- TurkNet Iletisim Hizmetleri A.S 17.1 km
- intibu - istanbul 17.9 km
More Verizon Communications data centers
- Verizon HMG9 Oslo Norway
- MCI Stockholm (Kista) Sweden
- MCI/Verizon Brussels (Diegem) E Belgium
- MCI/Verizon Paris St Denis France
- Verizon Atlanta United States
- Verizon Madrid Spain
- XO Salt Lake City IP PoP United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.