US Signal data center in Romulus

US Signal data center in Romulus is an operational data center operated by US Signal in Romulus, United States. Our footprint estimate of its power is about 2.3 MW.

Key facts

StatusOperational
OperatorUS Signal
Facility power2.3 MW (range 1.1 MW to 3.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,896 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 980 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates42.23533, -83.44414

Power and grid

Nearest high-voltage substationDouglass Substation, 120 kV, 600 m away (ITC)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWayne Substation, 345 kV, 8.5 km away
HV substations within 10 km20
UtilityWyandotte Municipal Serv Comm (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineANR Pipeline Co, interstate pipeline, 8.5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km7.9 GW in 27 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity455 g CO₂ per kWh (Michigan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 42%, coal 23.2%, nuclear 21.7%, wind 8%, solar 2.6%. Clean power: 34.5%
Industrial power priceUSD 0.090 per kWh (Michigan, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.4 °C (2001 to 2025)
Cooling degree days433 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.79 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayLow - Medium (10-20%) (Michigan)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does US Signal data center in Romulus use?

We estimate the facility power at about 2.3 MW. Estimate from building footprint, low confidence.

How close is US Signal data center in Romulus to the power grid?

The nearest high-voltage substation in OpenStreetMap is Douglass Substation (120 kV), about 600 m away. The local utility is Wyandotte Municipal Serv Comm, in the MISO balancing area.

How clean is the power for US Signal data center in Romulus?

The grid in Michigan emits about 455 g CO₂ per kWh (2025). Largest sources: gas 42%, coal 23.2%, nuclear 21.7%.

Who operates US Signal data center in Romulus?

US Signal.