US Signal data center in Romulus
US Signal data center in Romulus is an operational data center operated by US Signal in Romulus, United States. Our footprint estimate of its power is about 2.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | US Signal |
| Facility power | 2.3 MW (range 1.1 MW to 3.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,896 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 980 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 42.23533, -83.44414 |
Power and grid
| Nearest high-voltage substation | Douglass Substation, 120 kV, 600 m away (ITC) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Wayne Substation, 345 kV, 8.5 km away |
| HV substations within 10 km | 20 |
| Utility | Wyandotte Municipal Serv Comm (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | ANR Pipeline Co, interstate pipeline, 8.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 7.9 GW in 27 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 455 g CO₂ per kWh (Michigan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 42%, coal 23.2%, nuclear 21.7%, wind 8%, solar 2.6%. Clean power: 34.5% |
| Industrial power price | USD 0.090 per kWh (Michigan, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.4 °C (2001 to 2025) |
| Cooling degree days | 433 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.79 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Michigan) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does US Signal data center in Romulus use?
We estimate the facility power at about 2.3 MW. Estimate from building footprint, low confidence.
How close is US Signal data center in Romulus to the power grid?
The nearest high-voltage substation in OpenStreetMap is Douglass Substation (120 kV), about 600 m away. The local utility is Wyandotte Municipal Serv Comm, in the MISO balancing area.
How clean is the power for US Signal data center in Romulus?
The grid in Michigan emits about 455 g CO₂ per kWh (2025). Largest sources: gas 42%, coal 23.2%, nuclear 21.7%.
Who operates US Signal data center in Romulus?
US Signal.
Data centers near Romulus
- Otava Metro Detroit 10.8 km
- Comcast 20.4 km
- Synergy Fiber 24.2 km
- EdgeConneX Detroit (EDCDET01) 28.1 km · 6.5 MW
- 365 Data Centers Detroit (DT1) 30.2 km
- ManagedWay SFJ2 31.0 km
- 123.NET - DC1 - 24700 Northwestern Hwy. 31.3 km
- Verizon Wireless data center in Detroit 31.9 km · 4.6 MW
More US Signal data centers
- US Signal - Oak Brook United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.