Whipcord TDC01
Whipcord TDC01 is an operational data center operated by Whipcord Edge Data Centers in Etobicoke, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Whipcord Edge Data Centers |
| Address | 75 Horner Ave., Unit 14 |
| Coordinates | 43.61250, -79.51532 |
| Website | whipcord.com |
Power and grid
| Nearest high-voltage substation | Horner TS, 230 kV, 500 m away (Hydro One) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 15 |
| Power plants within 50 km | 4.7 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.2 °C (2001 to 2025) |
| Cooling degree days | 288 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.65 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Whipcord TDC01 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Horner TS (230 kV), about 500 m away.
How clean is the power for Whipcord TDC01?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Whipcord TDC01?
Whipcord Edge Data Centers.
Data centers near Etobicoke
- Canada15Edge Data Center 77 m
- Compass 1.6 km · 39 MW
- eStruxture TOR-3 2.1 km
- Hut 8 GTA1 8.1 km
- Cogent Mississauga 8.5 km
- Cologix TOR2 8.9 km
- CentriLogic Mississauga (MIS) 10.0 km
- Cogent Mississauga 2 10.1 km
More Whipcord Edge Data Centers data centers
- Whipcord LDC01 Canada
Sources