Data Center Directory

XL360

XL360 is an operational data center operated by Xavier Lafaure in Toulon, France. Our footprint estimate of its power is about 3.5 MW.

Key facts

StatusOperational
OperatorXavier Lafaure
Facility power3.5 MW (range 1.7 MW to 5.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,456 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asXL 360 - Data Center
Address360 boulevard du Commandant Nicolas
Coordinates43.12780, 5.93287
Websitexl360.fr

Power and grid

Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does XL360 use?

We estimate the facility power at about 3.5 MW. Estimate from building footprint, low confidence.

How clean is the power for XL360?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates XL360?

Xavier Lafaure.

Data centers near Toulon

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.