西東京データセンター 1号棟
西東京データセンター 1号棟 is an operational data center in Nishi-Tokyo-shi, Japan. Our footprint estimate of its power is about 58 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 58 MW (range 29 MW to 93 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,726 m² building outline x 5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 25,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | 西東京データセンター 2号棟 |
| Coordinates | 35.71702, 139.53454 |
Power and grid
| Nearest high-voltage substation | 武蔵境交流変電所, 154 kV, 1.6 km away (東日本旅客鉄道) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 北多摩変電所, 275 kV, 7.5 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 27 GW in 36 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 13.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.5 °C (2001 to 2025) |
| Cooling degree days | 700 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.89 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | Medium - High (20-40%) (Tokyo) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 西東京データセンター 1号棟 use?
We estimate the facility power at about 58 MW. Estimate from building footprint, low confidence.
How close is 西東京データセンター 1号棟 to the power grid?
The nearest high-voltage substation in OpenStreetMap is 武蔵境交流変電所 (154 kV), about 1.6 km away.
How clean is the power for 西東京データセンター 1号棟?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Data centers near Nishi-Tokyo-shi
- Secure Data Center Bekkan 4.4 km
- 野村総合研究所 東京第一DC 14.3 km · 16 MW
- NTT DOCOMO BUSINESS TK8 - Tokyo 14.5 km
- AIST ABCI 3.0 14.6 km · 8.6 MW
- Rakuten 14.6 km
- NTT武蔵村山電話交換局 15.1 km · 1.6 MW
- TYO3 Tokyo Data Center 15.6 km · 1.5 MW
- NTT Docomo 15.6 km