西東京データセンター 1号棟 is an operational data center in Nishi-Tokyo-shi, Japan. Our footprint estimate of its power is about 58 MW.

Key facts

StatusOperational
Facility power58 MW (range 29 MW to 93 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,726 m² building outline x 5 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 25,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known as西東京データセンター 2号棟
Coordinates35.71702, 139.53454

Power and grid

Nearest high-voltage substation武蔵境交流変電所, 154 kV, 1.6 km away (東日本旅客鉄道)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substation北多摩変電所, 275 kV, 7.5 km away
HV substations within 10 km8
Power plants within 50 km27 GW in 36 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity474 g CO₂ per kWh (Japan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33%

Climate and water

Average temperature13.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.5 °C (2001 to 2025)
Cooling degree days700 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.89 kWh per m² per day
Wind at 50 m5.4 m/s average
Water stress todayMedium - High (20-40%) (Tokyo)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does 西東京データセンター 1号棟 use?

We estimate the facility power at about 58 MW. Estimate from building footprint, low confidence.

How close is 西東京データセンター 1号棟 to the power grid?

The nearest high-voltage substation in OpenStreetMap is 武蔵境交流変電所 (154 kV), about 1.6 km away.

How clean is the power for 西東京データセンター 1号棟?

The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.

Data centers near Nishi-Tokyo-shi

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.