180 E Broad St.
180 E Broad St. is an operational data center operated by Hexion Building in Columbus, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Hexion Building |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Also known as | Continental Plaza · CENTRA CMH01 - Columbus Ohio (180 E Broad) |
| Address | Meet-Me-Room, 180 E Broad St |
| Coordinates | 39.96318, -82.99599 |
| Website | deepedgerealty.com |
Power and grid
| Utility | City Of Columbus (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 7.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for 180 E Broad St.?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates 180 E Broad St.?
Hexion Building.
Data centers near Columbus
- Crown Castle Columbus (101 E Town) 481 m
- WOW! Business (Columbus Datacenter) 497 m
- Racksquared Data Centers 502 m
- Cogent Columbus 552 m
- Citynet Columbus 563 m
- Bresco Broadband Data Center 734 m
- Cogent Columbus 2 1.2 km
- Google Columbus 11.3 km · 364 MW