Bresco Broadband Data Center
Bresco Broadband Data Center is an operational data center operated by Bresco Broadband in Columbus, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Bresco Broadband |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Address | 423 E Town Street |
| Coordinates | 39.95980, -82.98860 |
| Website | brescobroadband.com |
Power and grid
| Nearest high-voltage substation | Gay Street Substation, 138 kV, 900 m away (AEP Ohio) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Roberts Substation, 345 kV, 12.2 km away |
| HV substations within 10 km | 24 |
| Utility | City Of Columbus (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 6.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.5 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Bresco Broadband Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Gay Street Substation (138 kV), about 900 m away. The local utility is City Of Columbus, in the PJM balancing area.
How clean is the power for Bresco Broadband Data Center?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Bresco Broadband Data Center?
Bresco Broadband.
Data centers near Columbus
- Crown Castle Columbus (101 E Town) 714 m
- 180 E Broad St. 734 m
- Racksquared Data Centers 858 m
- WOW! Business (Columbus Datacenter) 1.0 km
- Citynet Columbus 1.1 km
- Cogent Columbus 1.1 km
- Cogent Columbus 2 1.8 km
- Google Columbus 11.0 km · 364 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.